Real-time operational prioritization















| Sev | Dir | Type | Entity | Signal | Value | Persist | Lifecycle | Assigned | |
|---|---|---|---|---|---|---|---|---|---|
📌Priority Alarms - Immediate Attention Required1 items | |||||||||
Turbine-E-01 | Acoustic | 42.3 dB 85 dB | 108m | NEWESCALATING | — | ||||
Turbine-E-01 | Temperature | 84.7°C 100°C | 86m | ACKNOWLEDGED | — | ||||
Compressor-B-03 | Current | 106.7A 120A | 56m | ACKNOWLEDGEDESCALATING | A. Chen | ||||
Generator-C-02 | Current | 99.6A 120A | 145m | ACTIONED | A. Chen | ||||
Motor-D-05 | Current | 98.9A 120A | 36m | ACTIONED | K. Patel | ||||
Turbine-E-01 | Current | 149.8A+9.8 over critical 120A | 74m | NEW | — | ||||
Turbine-E-01 | Vibration | 23.75 mm/s+3.7 over critical 50 mm/s | 48m | UNACKNOWLEDGED | — | ||||
Generator-C-02 | Pressure | 116.9 PSI 150 PSI | 10m | NEW | — | ||||
Compressor-B-03 | Pressure | 144.0 PSI+4.0 over critical 150 PSI | 56m | UNACKNOWLEDGED | M. Rodriguez | ||||
Turbine-E-01 | Acoustic | 62.1 dB+7.1 over warning 85 dB | 83m | ACKNOWLEDGED | — | ||||
Valve-F-04 | Temperature | 91.7°C+6.7 over warning 100°C | 36m | ACKNOWLEDGED | — | ||||
Pump-A-01 | Acoustic | 59.2 dB+4.2 over warning 85 dB | 69m | ASSIGNED | J. Smith | ||||
Motor-D-05 | Pressure | 135.6 PSI2026-03-24T15:36:07.347Z+15.6 over warning 150 PSI | 50m | ASSIGNED | M. Rodriguez | ||||
Turbine-E-01 | Temperature | 83.4°C 100°C | 27m | ACTIONED | J. Smith | ||||
Motor-D-05 | Vibration | 13.25 mm/s 50 mm/s | 27m | ACTIONED | A. Chen | ||||